1
1
View of the east façade of the Engine Assembly [?] Building, General Motors Corporation Truck and Coach division Pontiac Plant, Pontiac, Michigan
View of the east façade of the Engine Assembly [?] Building, General Motors Corporation Truck and Coach division Pontiac Plant, Pontiac, Michigan
People:
  • Hedrich-Blessing (Firm) (photographic studio)
  • Albert Kahn Associated, Inc. Architects and Engineers (role unspecified)
  • General Motors Corporation (client)
Title:

View of the east façade of the Engine Assembly [?] Building, General Motors Corporation Truck and Coach division Pontiac Plant, Pontiac, Michigan

Date:

May 1948

Form:
photographs
Quantity / Object type:
1 photograph(s)
Technique and media:

Gelatin silver print

Dimensions:

comp.: 18.6 x 23.5 cm sheet: 20.6 x 24.4 cm

Reference number:

PH2000:0270

Point of View:
  • exterior view
Inscription:

stamped and imprinted - in black ink, on the sheet, verso, c.l. to l.l.: "If this Photograph is used / for reproduction, kindly use / the following credit line: HEDRICH-BLESSING" stamped, imprinted and numbered - in black ink, on the sheet, verso, l.l.: "HEDRICH-BLESSING, LTD. / CHICAGO / NEG. No. 11196-J" [negative number added by a second stamp] labelled, imprinted, dated and numbered - printed and in typescript and black ink, on a paper label attached to the sheet, verso, u.c. to c.: "NAME OF OWNER / [GMC TRUCK & COACH DIVISION / GENERAL MOTORS CORPORATION] / LOCATION [Pontiac, Michigan] / DESCRIPTION [Engine Shop - Northeast Corner] / DATE TAKEN / [May 1948] JOB No. [1728-P] / PHOTOGRAPHER / [Hedrich - 11196-J]" [text in square parentheses indicates typescript within printed form of label] stamped and imprinted - in black ink, on the sheet, verso, c. to c.r.: "IF THIS PHOTOGRAPH IS USED FOR PUBLICATION / PURPOSES CREDIT MUST BE GIVEN TO / ALBERT KAHN ASSOCIATES / ARCHITECTS & ENGINEERS / Detroit, Michigan"

Location:

Pontiac; Michigan; United States;

Subject:
  • architecture
  • engineering
Subject Descriptive Terms:
  • entrances
  • fence
  • windows
  • buses
  • industrial complex
  • industrial building
  • automobile assembly plant
  • factory (structure)
Credit line:
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal;
Don de Federico Bucci/
Gift of Federico Bucci
Actions:
1
1

Sign up to get news from us

Email address
First name
Last name
By signing up you agree to receive our newsletter and communications about CCA activities. You can unsubscribe at any time. For more information, consult our privacy policy or contact us.

Thank you for signing up. You'll begin to receive emails from us shortly.

We’re not able to update your preferences at the moment. Please try again later.

You’ve already subscribed with this email address. If you’d like to subscribe with another, please try again.

This email was permanently deleted from our database. If you’d like to resubscribe with this email, please contact us

Please complete the form below to buy:
[Title of the book, authors]
ISBN: [ISBN of the book]
Price [Price of book]

First name
Last name
Address (line 1)
Address (line 2) (optional)
Postal code
City
Country
Province/state
Email address
Phone (day) (optional)
Notes

Thank you for placing an order. We will contact you shortly.

We’re not able to process your request at the moment. Please try again later.

Folder ()

Your folder is empty.

Email:
Subject:
Notes:
Please complete this form to make a request for consultation. A copy of this list will also be forwarded to you.

Your contact information
First name:
Last name:
Email:
Phone number:
Notes (optional):
We will contact you to set up an appointment. Please keep in mind that your consultation date will be based on the type of material you wish to study. To prepare your visit, we'll need:
  • — At least 2 weeks for primary sources (prints and drawings, photographs, archival documents, etc.)
  • — At least 48 hours for secondary sources (books, periodicals, vertical files, etc.)
...