1
1
The Toronto Sun Publishing Limited, Press Plant and Office Building, Toronto (1973-1975)
Part of:
People:
  • John Cresswell Parkin (archive creator)
Title:

The Toronto Sun Publishing Limited, Press Plant and Office Building, Toronto (1973-1975)

Date:

1972-1976

Level of archival description:
Project
Extent and medium:
  • Approximately 285 drawings (including 268 reprographic copies)
    10 photographic materials
    1.05 l.m. of textual records
    1 mounted work of art
Scope and content:
This project series documents the design and construction of the Toronto Sun building in downtown Toronto from 1973-1975. The office identified the project number as 7312.
This project consisted of a 97,000 square foot office building and press plant at 333 King Street East, spanning to Front, Ontario, and Berkley Streets. The design included spaces for administrative, editorial and publishing offices as well as a press hall, platemaking area, photo studio, mail room, roll storage and composing area. The printing and publishing side of the structure was designed to accomodate for further expansion, which occurred in the decade following its original construction. The total cost of the project was $3.7 million.

The project is recorded through drawings, photographs, textual records, and a project painting dating from 1972-1976. The drawings consist largely of reprographic copies of floor plans, elevations, landscaping, details and site plans, but some sketches are included. There are also presentation boards of floor plans and the design and construction schedule. The photographs show printing presses and press buildings. The textual records include correspondence, conference reports, interoffice letters, consultancy records, specifications, site reports, building and zoning records, financial records, tender documents, change orders, contract data, deficiency lists and supplementary instructions. Box AP018.S1.1973.PR12.007 contains an index to the textual records, which was created by the office.
Reference number:

AP018.S1.1973.PR12

Arrangement:
Materials in this project series have been kept in their original order and/or arranged by material type. Some materials were arranged to reflect the original classification created by the office.
Location:

Toronto Ontario Canada

Related units of description:
  • File AP018.S1.1982.PR07.004 (folder 07) in this fonds also contains photo negatives for this project. File AP018.S1.1973.PR12.003 in this project series also contains drawings from the project series AP018.S1.1976.PR05, also described in this fonds. Records for related projects are also included in this fonds, see: AP018.S1.1973.PR24, The Toronto Sun Publishing Limited, Press Plant and Office Building, Detailed Layouts, Toronto; AP018.S1.1974.PR05, The Toronto Sun Publishing Limited, Press Plant and Office Building, Interiors, Toronto; AP018.S1.1976.PR05, The Toronto Sun Publishing Limited, Press Plant and Office Building, Functional Planning, Toronto; AP018.S1.1976.PR12, The Toronto Sun Publishing Limited, Press Plant and Office Building, Extension of Mezzanine Floor, Toronto; AP018.S1.1976.PR25, The Toronto Sun Publishing Limited, Press Plant and Office Building, Alterations and Press Hall Extension, Toronto; AP018.S1.1978.PR01, The Toronto Sun Publishing Limited, Edmonton Sun Plant Facility, Edmonton, Alberta; AP018.S1.1978.PR10, The Toronto Sun Publishing Limited, Press Plant and Office Building, Office Addition, Toronto; AP018.S1.1978.PR12, The Toronto Sun Publishing Limited, Press Plant and Office Building, Alteration to Existing Facilities, Toronto; AP018.S1.1979.PR07, The Toronto Sun Publishing Limited, Press Plant and Office Building, Press Line No. 2 Addition, Toronto; AP018.S1.1979.PR09, The Toronto Sun Publishing Limited, Press Plant and Office Building, Existing Building, Toronto; AP018.S1.1981.PR18, The Toronto Sun Publishing Limited, Press Plant and Office Building, Alterations to Press Hall, Toronto; AP018.S1.1982.PR05, The Toronto Sun Publishing Limited, Press Plant and Office Building, Alterations to Press Hall, D Press, Toronto.
1
1

Sign up to get news from us

Email address
First name
Last name
By signing up you agree to receive our newsletter and communications about CCA activities. You can unsubscribe at any time. For more information, consult our privacy policy or contact us.

Thank you for signing up. You'll begin to receive emails from us shortly.

We’re not able to update your preferences at the moment. Please try again later.

You’ve already subscribed with this email address. If you’d like to subscribe with another, please try again.

This email was permanently deleted from our database. If you’d like to resubscribe with this email, please contact us

Please complete the form below to buy:
[Title of the book, authors]
ISBN: [ISBN of the book]
Price [Price of book]

First name
Last name
Address (line 1)
Address (line 2) (optional)
Postal code
City
Country
Province/state
Email address
Phone (day) (optional)
Notes

Thank you for placing an order. We will contact you shortly.

We’re not able to process your request at the moment. Please try again later.

Folder ()

Your folder is empty.

Email:
Subject:
Notes:
Please complete this form to make a request for consultation. A copy of this list will also be forwarded to you.

Your contact information
First name:
Last name:
Email:
Phone number:
Notes (optional):
We will contact you to set up an appointment. Please keep in mind that your consultation date will be based on the type of material you wish to study. To prepare your visit, we'll need:
  • — At least 2 weeks for primary sources (prints and drawings, photographs, archival documents, etc.)
  • — At least 48 hours for secondary sources (books, periodicals, vertical files, etc.)
...