Project
This project series documents the long term planning for the Bank of Montreal Central Computer Complex Two in Scarborough, Ontario from 1977-1997. The office identified the project number as 7710.
This master plan, spanning the length of 20 years, outlined 4 phases of construction for the complex. The plan called for the construction of three buildings starting in 1977, with the addition of more buildings on the site over the following two decades. The proposal showed that each new building was to be joined to existing buildings by tunnels at each level. However, only three buildings were ever constructed on this site.
The project is recorded through textual records and drawings dating from 1977-1978. The textual records consist of meeting minutes, consultant correspondence and site reports.
Material in this project series was kept in its original order.
Scarborough Ontario Canada
Sort by:
1 File
John C. Parkin fonds
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal
Don de John C. Parkin/
Gift of John C. Parkin
018-213-08
1 File
John C. Parkin fonds
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal
Don de John C. Parkin/
Gift of John C. Parkin
018-213-09
Sign up to get news from us
Thank you for signing up. You'll begin to receive emails from us shortly.
We’re not able to update your preferences at the moment. Please try again later.
You’ve already subscribed with this email address. If you’d like to subscribe with another, please try again.
This email was permanently deleted from our database. If you’d like to resubscribe with this email, please contact us
Please complete the form below to buy:
[Title of the book, authors]
ISBN: [ISBN of the book]
Price [Price of book]
Thank you for placing an order. We will contact you shortly.
We’re not able to process your request at the moment. Please try again later.