This project series documents the site consultancy and construction of the College of Nurses of Ontario in Toronto from 1980-1982. The office identified the project number as 8003.
This project consisted of a building with a three-storey office space and atrium on the east side and a single-storey council chamber on the west side. The project was adapted to fit its surroundings, which had a residential landscape to the west and commercial zoning to the east. The building was 2536 square meters in size and cost approximately $5.2 million. In 1982, the design won a Canadian Architect Award of Excellence. However, some judges later stated that design changes made during construction had destroyed the original concept and the finished building lacked the polish of the original proposal.
The project is recorded through drawings, photographs and textual records dating from 1980-1985. A large part of these drawings are reprographic copies arranged within the textual materials. There is also one presentation board of sections and elevations. Photographs show the project site and construction progress of the building. The textual records include construction invoices, correspondence, change orders, calculations, site reports, minutes of meetings, design notes and the program for the opening of the building.
Material in this project series has been compiled from different accessions and/or arranged by material type.
Sort by:
This is box of project documentation including invoices for construction, correspondence, change orders, and project site and construction photographs.
1 File
John C. Parkin fonds
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal
Don de Jennifer A.C. Parkin/
Gift of Jennifer A.C. Parkin
This is a box of project documentation including correspondence, calculations, change orders, mechanical drawings, details, inspection and testing reports, structural reports, and minutes of meetings.
1 File
John C. Parkin fonds
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal
Don de John C. Parkin/
Gift of John C. Parkin
This is a box of project documentation including mechanical and electrical drawings, correspondence, design notes, and the program for the opening of the building.
1 File
John C. Parkin fonds
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal
Don de Jennifer A.C. Parkin/
Gift of Jennifer A.C. Parkin
1 File
Sheet: 124 x 84 cm
John C. Parkin fonds
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal
Don de John C. Parkin/
Gift of John C. Parkin
1 File
Sheet: 124 x 84 cm
John C. Parkin fonds
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal
Don de John C. Parkin/
Gift of John C. Parkin
1 File
Sheet: 109 x 79 cm
John C. Parkin fonds
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal
Don de John C. Parkin/
Gift of John C. Parkin
018-221-02
This folder also contains a number of drawings for two projects that are not described in this fonds. The first is refered to as SKF Canada Ltd., and the second as John Matthey Offices.
1 File
Sheet (smallest): 31 x 27 cm Sheet (largest): 111 x 46 cm
John C. Parkin fonds
Collection Centre Canadien d'Architecture/
Canadian Centre for Architecture, Montréal
Don de John C. Parkin/
Gift of John C. Parkin
018-388-05
Sign up to get news from us
Thank you for signing up. You'll begin to receive emails from us shortly.
We’re not able to update your preferences at the moment. Please try again later.
You’ve already subscribed with this email address. If you’d like to subscribe with another, please try again.
This email was permanently deleted from our database. If you’d like to resubscribe with this email, please contact us
Please complete the form below to buy:
[Title of the book, authors]
ISBN: [ISBN of the book]
Price [Price of book]
Thank you for placing an order. We will contact you shortly.
We’re not able to process your request at the moment. Please try again later.